“Thinking outside the box led us to consider alternatives to raising the whole house. Clark Construction's alternate remedy gives the homeowners the peace of mind they sought as well as great additional interior space, optimizing the use of their remodeling funds."

The finished garage and master suite addition beside the original house

High and Dry at Last

(Wilton, CT)

Imagine buying a home with a beautiful brook in the backyard. Now imagine that same brook causing your partially below grade playroom and garage to flood in heavy rains, a “phantom menace” that comes and goes and so quickly, most often at night, so that you hardly ever actually see it in daylight.

Other firms suggested raising the whole house, an extremely costly proposition.

We channeled the clients’ money differently - developing a solution that involved closing off water access points and building a new garage slightly above the flood plain, then adding a new mud room entry and a master suite addition to top it all off. The additions blend seamlessly with the home’s original architecture.

The Silvermine River behind the house at its normal level

It’s hard to imagine the volume of water that appeared and the extent of the water problem, but here are a few shots that help to tell that story.

Here’s the stream. Actually it’s the Silvermine River, part of the Norwalk River Watershed.

The river swollen and fast during a storm

It wasn’t unusual for the water level to rise eight feet or more for a short time during storms.

The stream risen over its banks

The good news was that when this happened, the stream rose suddenly and then quickly subsided.

The backyard swingset standing in floodwater, seen from the porch

During these surges, the water typically totally flooded the backyard. Here’s the swingset as seen from the porch. No place to play unless you like to swim.

The same backyard and swingset on a dry day

The same view, from the porch, on a normal day.

The driveway sloping down towards the house

The fact that the driveway sloped towards the house compounded the flood situation.

The driveway under water during a flood

Here’s a shot the driveway, during one of the flood periods.

The flooded garage with a boat floating inside

Turning around to look at the garage you can see that not only couldn’t you park your car in the garage, but the basement totally filled as well.

Heroic efforts were made to keep the water out, such as plasticing up the garage doors and putting up interior barricades, although it’s almost impossible to stop water going where it wants to go.

The front of the house on a sunny day, before the work
The side of the house and the old garage, before the work

Here’s a couple shots of the home on a dry sunny day.

Plot plan of the property before and after the addition

As we began the design process we discovered a lot of constraints on what was permissible. The Conservation Commission would not allow regrading around the house because of a concern that this would displace water downstream, which limited some of the options.

The plan that made the most sense was to close off all current points of water access into the house (garage doors, man door, back door under the porch) and then build an addition in the gully between the upper part of the driveway and the original garage.

This would gave our clients a structure at a higher elevation, with any doors a few inches above the flood plain. This would ensure that water would not invade the home during normal storm surges.

Driveway elevation drawing showing the old and new water levels

Here you can see visually how the water elevation changed as a result of the work. Positioning the addition in this way allowed us to keep the water back away from the house without regrading the yard.

Rear elevation drawing with the raised garage

Similarly, at the back, the water was kept further away, because the garage is two feet higher than it was.

Front elevation drawing of the new garage and master suite

Our clients also wanted a master bedroom suite. Due to health code limiting the number of bedrooms, based upon septic tank size, it was desirable to maintain the same number of bedrooms while adding on. In order to do so, we “un-bedroomed” one of the old bedrooms, turning it into an open office and/or homework area.

This allowed us to add a master bedroom to the home while remaining within health department limits for “number of bedrooms” based on their existing tank, avoiding any septic costs.

The upstairs hallway with the storage room door at its end

This door at the end of the hallway leads to an existing storage room over the family room.

On the left side of the hall at the top of the stairs is where we will be cutting the existing bedroom wall down. By opening up the door and creating a knee wall, the former bedroom will no longer considered as such.

This works well for our clients, who are happy to have this repurposed space.

The storage room over the family room before the work

The existing storage room is the perfect place to create the new master suite.

It’s positioned to take advantage of backyard views, with easy access to the other bedrooms, as well as the stairs to the first floor.

The oversized family room before the work

The existing oversized family will be converted into a smaller family room with a new mud room and a relocated powder room.

The front facade and stoop before the work

Here’s the “Before” of the front of the house. A portico will be added and the front stoop modified to jazz up the front facade.

Construction Begins

The playroom door closed up from inside

The first step in stopping water infiltration was to close up this playroom door and the door under the porch in order to alleviate the water problem before refinishing the interior.

The former playroom opening closed up, seen from outside

This exterior shot shows the opening to the former playroom after it was closed up.

The basement room with new sheetrock and insulation

Just inside the closed up opening is the basement. We finished off this room in advance of the major construction so that the clients could use it for storage while we completed the remainder of the project.

The first step of the refinishing project was to replace the the former flood-damaged sheetrock and insulation.

Orange tile underlayment laid on the basement slab

A special underlayment, Ditramat, was used on the cement before tiling to preclude tile cracking. We often use this material under large tiles, as it provides a superior, long lasting, final product.

Close-up of the finished basement tile floor

Here is a closeup of the finished product, showing a subtle pattern created by alternating the direction of the tile.

Silt fencing and hay bales around the work area

While installing the basement tile floor, the outside was being prepared for the addition portion of the project to start.

Silt fencing and hay bales were laid out to protect the wetland environment during construction.

An excavator breaking up the asphalt driveway

Necessary excavation began with removal of the asphalt driveway.

The old driveway loaded into a dump truck

The old driveway was loaded into dump trucks and taken to a recycling center.

The water-filled trench for the garage footings

What looks like a moat is actually a trench for the new garage footings.

Because it was below the water table, the trench was filling with ground water so quickly that we had to pump continuously in order to get it dry enough to be able to pour concrete.

The garage footings formed and poured

The footings were formed and poured, allowing the new garage to take shape.

The first course of concrete block on the footings

The first course of block was laid over the cured foundation.

Masons building up the block foundation

The masons continued to work on finishing the foundation.

The old garage doors being closed up in the distance

In the distance, you can see the former garage doors being closed up.

The finished garage slab

With the slab complete, it almost looks so flat you could skate on it!

Fill brought in around the new foundation

Backfilling was done next.

We brought in several truckloads of fill for use under the addition, but due to Wetlands requirements, the surrounding area had to be reshaped to its existing condition.

The extended front stoop with flagstone and stone veneer

The masons extended the stoop, adding flagstone and a stone veneer.

The front walk rebuilt at the new grade among the plantings

The sidewalk was reconfigured at the new grade, saving as many of the original plantings as possible.

The new garage foundation beside the lower old garage

This view gives you an idea of how much higher the new garage, (on the right), will sit relative to the old garage, seen here on the left

The storage room roof stripped down to the joists

The next step was to frame the master bedroom addition.

As the plan was to raise the roof, we stripped the former storage room roof down to the joists, and then cut them back where the roof was to be raised, as you can see in the next photo.

The family room with its picture window removed

The demolition continued with the removal of the family room picture window and balance of the roof framing.

Wall framing for the new master suite

Here you can see the new master bedroom suite is taking shape.

The master bedroom roof framed to match the house

As the master bedroom roof was framed the addition started to mimic the rooflines of the original house.

Framing for the master bedroom tray ceiling

The shape of the master bedroom’s tray ceiling can be seen in the framing.

Oversized tarps over the addition roof

Oversized tarps kept the cold winter rains out of the home while work continued inside.

The master suite wrapped in house wrap as garage framing begins

With the roof on the master suite complete and the home buttoned up tight with a moisture barrier, framing of the garage could begin.

Carpenters raising a framed garage wall

To speed the framing process, walls were constructed in their entirety on the floor and then raised into place.

The garage walls framed and standing

With the walls up, the oversized garage is really starting to take shape.

The garage gable roofs framed

Repeating the original gable rooflines made for a seamless addition.

Framing of the mud entry between garage and house

The new mud entry attaches the new garage to the house.

The addition wrapped and ready for siding

Now everything’s buttoned up, ready for exterior trim and siding.

The front-yard tree kept beside the addition

Advanced planning of the addition’s location allowed this tree in the front yard to be saved.

The new mud entry door seen from the upper landing

Looking down from the upper landing you can see the newly installed mud entry door.

Sheetrock going up on the family room ceiling with a lift

Here you can see sheetrock being installed on the family room ceiling.

A hand crank sheetrock lift that was used to raise the large pieces of sheetrock into position, faciliating their manipulation and speeding up the process.

New oak flooring laid in the addition

Oak floors were laid in the new master bedroom, family room and mudroom.

The open office area with a view into the new master suite

On the left you can see the existing guest bedroom wall which was cut down.

If you look past this new office area, you can see into the new master bedroom suite, which was converted from the storage room.

These areas are trimmed and ready for paint.

The furniture-style double vanity in the new bathroom

A beautiful furniture style double vanity is the star of the new bathroom.

The patterned tile layout in the large shower

Creative tile layouts helped break up an over-sized shower.

Once the shower tile was completed we were able to template for the frameless glass shower enclosure.

Newel post and banister in the mudroom entry

While trim is being completed through out the house, finishing touches such as the newel posts and banister for the mudroom entry could be installed.

Siding and trim going on the addition

Interior and exterior work ran concurrently. Siding and trim were installed as the project neared completion.

The new garage doors installed

New garage doors and openers were installed. These newer doors offer superior insulation and quieter operation than their older counterparts.

Scaffolding along the back of the house for siding

Ladder jacks and scaffolding made it possible to do the siding on the back of the house with ease.

The new front portico framed and trimmed

The new portico was constructed and trimmed out.

The portico with square columns and railing

Square columns and maintenance free railing materials were installed to finish it off.

The second-floor hall brightened by the opened office wall

An added benefit of opening up the wall at the new office was bringing natural light into a previously dark second floor hall.

The painted master suite seen through its doorway

Here you can see the view into the master bedroom suite after it was painted and ready for move in.

The master bedroom window facing the bed wall

The placement of this window opposite the bed wall ensures opening your eyes to a beautiful view each morning.

The finished glass shower

The completed shower offers an abundance of glass to provide natural light and a view through nearby windows.

The dark vanity with its honed marble top

The vanity is topped with honed marble, which elegantly contrasts its dark finish.

The finished mud entry in warm colours

Here you can see the completed mud entry finished with warm bright colors, inviting you into the home.

Oak flooring running through the powder room, family room and mudroom

Continuous oak flooring in the powder room, family room and the mudroom make these spaces flow smoothly together.

The completed mud room

Here’s the mud room we keep mentioning, completed.

The finished master bedroom under its tray ceiling

The finished master bedroom shows how the tray ceiling adds height and drama to the space.

Book shelves in the niche behind the master bedroom door

A small niche behind the master bedroom door made the perfect place to add some book shelves.

The back of the house with the master suite over the family room

Here are some completed shots of the master bedroom suite, after painting.

From the back, you can see the new master bedroom suite atop the family room, with the garage to the left.

The completed addition and garage with the gravel walk to the mud entry

Here you can see the completed addition and garage with a gravel walkway to the mud entry door.

Note the horizontal window in the family room where the client’s children can peek out and see who’s coming down the driveway.

The completed front of the house

In this view of the completed front you can see how the new roof lines work seamlessly with the old.

The finished front entry under the new portico

And last but not least, the front entry is completed and ready to welcome friends and family into their newly updated and water tight home.

“We have done three projects with Clark Construction in the last five years and continue to be thrilled with the results. The common thread through all of the projects has been the detail of project planning and design, the quality of the work, and the ability to stay right on schedule.”

Jeff P.

Jeff P.

Wilton, CT

Get in Touch.

Whether your house is old or new, we can take it to the next step with you.

Schedule a call today